Beautiful Blog

HDG Receives Two Awards in BUILD’s 2020 Architecture Awards

October 29, 2020

HDG was recently received two awards by BUILD Magazine in the global BUILD Architecture Awards 2020:

  • Best Full-Service Architecture & Design Firm 2020 – Pennsylvania
  • Best Education Architecture Project (Pennsylvania): Peters Township High School

Now in its fifth year, BUILD’s Architecture Awards highlights the extraordinary work and expertise of architects around the world.  As a leading trade publication, BUILD Magazine promotes all construction, engineering and property related services. The Magazine has a steady and dedicated 110,000 readers, plus over 100,000 users, making them among the world’s leaders in the construction and engineering publishing arena.

We are delighted to have received these awards which truly signify our commitment to providing quality architecture and exceptional service to our clients.  Congratulations to all of this year’s winners: https://www.build-review.com/winners-list/?award=81998-2020.

Read the Official Press Release: https://www.build-review.com/build-magazine-announces-the-2020-architecture-award-winners/

More about the Award-Winning Peters Township High School Project

The new 298,000 SF, three-story high school currently being constructed will consist of three wings (Academic, Fine Arts, and Physical Education).  Features of the new high school include: fifty general instruction classrooms surrounding a two-story Learning Commons with an adjacent learning stair, 1,200-seat performance auditorium, food court style cafeteria with an outdoor dining patio, 2,000-seat multi-sport gymnasium, 300-seat auxiliary gymnasium, and an 8-lane natatorium.  The design also features 21st century learning concepts including interactive technology and spaces that promote collaboration with flexible furniture arrangements.  Security features were also incorporated into the design and include secure, single point of entry, wide corridors, cameras, and an emergency notification system. Construction of the new high school began in July 2018 and is anticipated to be complete in December 2020.

For more about this project, visit: https://www.hayesdesign.com/portfolio-item/peters-township-high-school/.

Post a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.